|
|
Scholarly Publications |
|
Publications in SCI Journals |
|
|
2009 |
"A Joint Replenishment Policy with Individual Control and Constant Size Orders". Co-authors: M.M. Tanrikulu, A. Sen. To appear in International Journal of Production Research |
|
"Integrated Capacity and Inventory Management with Capacity Acquisition Lead Times". Co-authors: G. Mincsovicz, T. Tan. European Journal of Operational Research, 196, 949 – 958 |
|
|
"Integrated Workforce Capacity and Inventory Management Under Temporary Labor Supply Uncertainty". Co-authors: M.F. Pac, T. Tan. International Journal of Production Research, 47 (15) 4281 - 4304 |
|
| “An Integrated Approach to Inventory and Flexible Capacity Management Under Non-stationary Stochastic Demand and Set-up Costs”. Co-author: T. Tan. OR Spectrum, 31(2), 337 – 360 | |
|
2008 |
“Tactical Capacity Management under Capacity Flexibility in Make-to-Stock Systems”. Co-author: T. Tan. IIE Transactions, 40(3)221 – 237 |
|
2007 |
“MAN Turkey Improves the Assembly Line Performance by Managing the In-House Parts”. Co-Authors: K. Erkoy, B.Y. Kara, and I. Sabuncuoglu. Interfaces 37(4), 353-354 |
| "Designing a Road Network for Dangerous Goods Shipments", Co-Author: E. Erkut. Computers & OR, 34(5), 1389-1405. | |
| “Integrated Routing and Scheduling of Hazmat Trucks with Stops En-Route”. Co-author: E. Erkut. Transportation Science, 41(1), 107-122. | |
|
2003 |
“An Efficient Genetic Algorithm for the p-Median Problem”, Co-authors: Z. Drezner, and E. Erkut. Annals of Operations Research. 122, 21-42. |
|
“Optimal Lot Sizing/Vehicle Dispatching Policies under Stochastic Lead Times and Incremental Setup Costs”, Co-authors: N. K. Erkip, and R. Gullu. Operations Research. 53(1). 160-166 |
|
| “Outsourcing Logistics: Design of Contracts Between a Manufacturer and a Transporter”, Co-authors: N. K. Erkip, and R. Gullu. Transportation Science, 37(1), 23-39. | |
|
Other Publications |
|
|
1997 |
“A Tabu Search Algorithm For Cell Formation Problem”, Co-authors: R. Gullu, S. Kayaligil, O. Kirca, and T. Tufekci. Remaphos Euroka/Factory 2nd Working Group Meeting Proceedings. |
|
“A Conceptual Model for MPS-MRP-CRP Operation in Holonic Manufacturing”, R. Gullu, S. Kayaligil, O. Kirca, and T. Tufekci. Remaphos Euroka/Factory 2nd Working Group Meeting Proceedings |
|
|
Work-In-Progress |
|
|
2009 |
“A Heuristic Algorithm for an Integrated Routing and Scheduling Problem with Stops En-Route”, Co-author: E. Uzun. Submitted for publication. |
| “Coordinated Logistics: Joint Replenishment with In-House Transportation in a Two Echelon Inventory System”, Co-authors: N.C. Buyukkaramikli, U. Gurler. Submitted for publication. | |
| "Inventory Control with Partial Batch Ordering", Co-authors: T. Tan, T. Huh. Submitted for publication. | |
| "Aggregate Production Planning Revisited: An Industrial Application Bringing in Research Questions", Co-authors: E. Demirci, N. Erkip, and A. Sen. Working paper | |
| "Optimal Sourcing Decisions Under Alternative Capacitated Suppliers ", Co-author: T. Tan. Working paper | |
| "Shortest Path Problems with Re-routing en-route", Co-author: B. Karakaya. Working paper | |